Charleston County School District . North Charleston, SC
This project included the new construction of a cement sidewalk and extension of the aluminum industrial fence (black).
Work also included:
- Storm Drain Relocation
- Paver Walkway
- Truncated Domes
![Cement mold in place to prepare for pouring of sidewalk.]()
Cement mold in place to prepare for pouring of sidewalk.
![Wood barrier to prevent debris from entering a nearby body of water during construction.]()
Wood barrier to prevent debris from entering a nearby body of water during construction.
![Side walk construction preparations.]()
Side walk construction preparations.
![Adjustments were made to the storm drain located near the wood molds.]()
Adjustments were made to the storm drain located near the wood molds.
![Silt fence for sediment control.]()
Silt fence for sediment control.
![Cement mold extending beyond gate.]()
Cement mold extending beyond gate.
![Boundary fence to prevent soil erosion.]()
Boundary fence to prevent soil erosion.
![Completed Sidewalk ; Hydroseed Landscape]()
Completed Sidewalk ; Hydroseed Landscape
![Paver walkway portion of completed sidewalk ; Hydroseed Landscape]()
Paver walkway portion of completed sidewalk ; Hydroseed Landscape
![Completed Sidewalk ; Hydroseed Landscape]()
Completed Sidewalk ; Hydroseed Landscape
![Truncated domes applied to end of sidewalk.]()
Truncated domes applied to end of sidewalk.
![Industrial Fence Extension added parallel to the sidewalk for the safety of pedestrians.]()
Industrial Fence Extension added parallel to the sidewalk for the safety of pedestrians.
![Close up of Fence extension.]()
Close up of Fence extension.
![Cement poured and leveled.]()
Cement poured and leveled.
![Truncated domes applied to end of sidewalk.]()
Truncated domes applied to end of sidewalk.
![Leveling of the concrete.]()
Leveling of the concrete.